Our client required
Installation of new fencing & gates;
New SVPs; alternations to the drainage;
External lightings;
Internal LED lighting upgrade;
New ventilation system; boiler/gas works;
EWI;
IWI;
Redecoration;
Door undercuts; to assist the ventilation strategy.